© APERTIF
Cabling was assembled as well and after testing members of the radio observatory installed the PAF FrontEnds of APERTIF in RT2, RT4, RT5, RT8, RT9 and RTA.
Six PAFs are installed now, the APERTIF team is doing a wonderfull job!
© APERTIF
Cabling was assembled as well and after testing members of the radio observatory installed the PAF FrontEnds of APERTIF in RT2, RT4, RT5, RT8, RT9 and RTA.
Six PAFs are installed now, the APERTIF team is doing a wonderfull job!