© CC BY-SA 3.0 IGO ESA
The different stages in the preparation of the land are nicely visible: cutting woods (August 2018), preparing an flattened area with yellow sand (December 2018), and putting two types gravel on it (March to May 2019, quite a bit more than necessary or desirable, in this case). Even the roll-out of the HBA tiles is visible (July and August 2019), as well as the moment the white lettering was put on top (October 2019) - it reads "VIRAC LOFAR-LATVIA LV-614", though this is not visible at this resolution.
Contains modified Copernicus Sentinel data 2018-2020 processed by Sentinel Hub. To play with this data, you can visit https://sentinelshare.page.link/yXZZ